NEWS

  • 2021-03-15 15:46
  • NFPA 130:2020 train­ing for a Swiss client

  • IFAB car­ried out a train­ing for a client in Switzer­land with the fol­low­ing top­ic: NFPA 130:2020 (Stan­dard for Fixed Guide­way Tran­sit and Pas­sen­ger Rail Sys­tems).

  • 2020-11-13 15:47
  • IFAB re-accred­it­ed to revised ISO/IEC 17025:2018-03!

  • IFAB was re-accred­it­ed accord­ing to the revised ISO/IEC 17025:2018-03 for the proof of the effec­tive­ness of water-based fire fight­ing sys­tems by fire tests for rolling stock (rail vehi­cles), indus­tri­al plants, pub­lic places, store rooms, engine and machin­ery spaces, tun­nel- and trans­port infra­struc­ture sys­tems as well as high-volt­age bat­ter­ies and the exper­i­men­tal deter­mi­na­tion of design fire … Con­tin­ue read­ing IFAB re-accred­it­ed to revised ISO/IEC 17025:2018-03!

  • 2020-10-20 11:38
  • Hot Smoke tests in a school in Wet­zlar

  • In a new build­ing of the Goethe-Schule in Wet­zlar IFAB has car­ried out hot smoke tests to val­i­date the flaw­less func­tion­al­i­ty of the installed fire detec­tion sys­tem.  The tests became nec­es­sary because some of the smoke detec­tors installed in the ceil­ing were par­tial­ly cov­ered by new­ly sus­pend­ed ceil­ings.

  • 2020-07-30 12:30
  • Fire tests for N2 Glob­al

  • IFAB has car­ried out for and togeth­er with N2 Glob­al a series of fire tests using var­i­ous N2 Glob­al fire extin­guish­ing sys­tems. Nitro­gen was used as the extin­guish­ing agent. The test sce­nar­ios were devel­oped and imple­ment­ed in close col­lab­o­ra­tion with N2 Glob­al.